ISO 9001 Registered
PH: 716.875.3380

Cylinder Remanufacturing Process

Every print cylinder that comes into HFW for reconditioning goes through the exact process outlined below, resulting in the same outcome – highly satisfied customers!

Step 1: Detailed Inspection

  • Disassembly and cleaning
  • Preliminary inspection of cylinder
  • Received condition (Diameter, TIR and surface condition)
  • Review parts for condition

Step 2: Engineered Services Manager Review

  • Analyze condition and establish work scope
  • Review with customer (If desired)
  • Prepare quotation (Or work scope summary)
  • Submit to customer

Step 3: Customer Approval

  • We will not initiate work until our customer fully approves and understands the work scope entailed

Step 4: Remanufacture

  • Prepare for coating
  • Establish Duragap® protective edge (If desired)
  • Thermal spray (Via metallize, plasma spray, or HVOF processes)
  • Proof finish
  • Precision machine slot (gap) to required width and radii
  • Dynamic balance and make necessary weight corrections (If required)
  • Assemble and install new bearers, bearings, and component parts
  • Finish grind to specifications
  • Final assembly
  • Inspection / documentation
  • Packaging